![]() A case study is presented to illustrate the applicability and the usefulness of the proposed method. The goal attainment method tries to balance all the objectives and make them as close as possible to the initial goals determined by MCO and MEO. The epsiv-constraint method minimizes the total cost while the emissions are less than a certain value epsiv determined by the linear programming when minimizing emissions only or by the designer. Each of the above problems may be solved using linear programming, but minimizing the two preceding objectives at the same time forms a multi-objective problem which is solved by the epsiv-constraint and the goal attainment methods. The minimum emissions objective (MEO) is now an important target to achieve subject to the above mentioned constraints. Traditionally a system plan was developed to achieve a minimum cost objective (MCO) while satisfying the energy demand, reliability, stability and battery constraints. Dalam membuat surat jalan, kamu bisa membuatnya melalui Microsoft Excel. Selain itu, surat jalan barang juga berfungsi sebagai bukti pengiriman antara pihak pengirim dan pihak penerima. Kita boleh memanfaatkan Excel AVERAGEIF berfungsi untuk mengira purata jualan dari Februari hingga tarikh semasa. Dokumen ini berisi detil mengenai barang yang dikirim, asal, dan tujuan pengiriman. This paper describes a methodology to design a hybrid renewable energy system over a certain planning horizon. Surat jalan barang adalah dokumen penting pada saat melakukan pengiriman barang. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |